掘进巷道爆破后排烟时间计算
CSTR:
作者:
作者单位:

(1.北京科技大学 土木与资源工程学院,北京 100083; 2.山东黄金归来庄矿业有限公司,山东 临沂273307)

作者简介:

曹杨(1988—),男,博士研究生; 纪洪广(1963—),男,教授,博士生导师

通讯作者:

纪洪广,jihongguang@ces.ustb.edu.cn

中图分类号:

X9

基金项目:

国家“十二五”科技支撑计划项目(2012BAK09B07)


Calculation of fume-drainage time of tunnel after blasting
Author:
Affiliation:

(1.School of Civil and Resource Engineering, University of Science and Technology Beijing, Beijing 100083, China; 2.Guilaizhuang Mining Co., Ltd., Shandong Gold Group, Linyi 273307, Shandong, China)

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    为研究掘进面爆破后排烟时间,推导掘进面炮烟运移规律公式,对排烟时间影响因素进行灰色关联度计算,得出主要影响因素的敏感性大小排序为:巷道出口到掘进面迎头的距离(0.827)>风筒口到掘进面迎头的距离(0.738)>风筒供风量(0.628)>炮烟中CO初始体积分数(0.547).在归来庄金矿掘进巷道中进行炮烟监测试验,研究了压入式通风条件下,风筒口到掘进面迎头的距离LO分别为10、15、20、25、30 m时,巷道出口到掘进面迎头的距离LP分别为40、60、80、100、120 m的排烟时间.研究结果表明:排烟时间随巷道出口到掘进面迎头的距离增加而变长,两者拟合成线性关系;排烟时间随风筒口到掘进面迎头的距离增加而变长,成非线性增加;排烟系数cLO拟合成线性关系,并推导出不同工况下排烟时间的计算式;在试验及相似巷道的5个工况下进行验证,相对误差为6.1%,3.8%,5.4%、8.8%,9.3%,具有较好的准确性和可靠性

    Abstract:

    To research fume-drainage time of tunnel after blasting, the formula of removal law of blasting fume in tunnel is deduced. Through calculating the grey correlation degree of influential factors of fume-drainage time, the ranking results of sensitive degree of main influential factors are: distance of entrance to tunnel face (0.827) > distance of duct to tunnel face(0.738) > air flow in duct(0.628) > initial volumetric concentration of CO in blasting fume(0.547). Blasting fume monitoring tests were conducted in tunnel to study the fume-drainage time when the distance of duct to tunnel face LO are respectively 10, 15, 20, 25, 30 m and the distance of entrance to tunnel face LP are respectively 40, 60, 80, 100, 120 m under the condition of forced ventilation. Research findings reveal that: fume-drainage time increases with the longer distance of entrance to tunnel face. The fitting result of the both is linear relation; fume-drainage time shows nonlinear rise with the addition of the distance of duct to tunnel face. The fitting result of fume-drainage coefficient c and LO is linear relation, and calculation formulas of fume-drainage time in different working condition are concluded. Verification of equation is carried out in 5 tested similar tunnels. And relative errors are respectively 6.1%, 3.8%, 5.4%, 8.8%, 9.3%, which have remarkable accuracy and reliability

    参考文献
    相似文献
    引证文献
引用本文

曹杨,纪洪广,周启明.掘进巷道爆破后排烟时间计算[J].哈尔滨工业大学学报,2017,49(8):135. DOI:10.11918/j. issn.0367-6234.201605096

复制
分享
相关视频

文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2016-05-23
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2017-07-30
  • 出版日期:
文章二维码